This picture shows the ground cleared and built up with gravel for the new kennel area.
The drain pipes and waste troughs are roughed in for preparation to pour the concrete kennel floor.
They are digging and installing a mini septic system to allow the waste to go underground from the troughs.
The drain system and ground are covered and await the concrete to be poured (if the rain stops..two weeks and waiting).
I am working to constructing a pigeon loft for the training pigeons.
The roof is going together but much more to go.
Finally got it put together and my daughters wanted to paint it so it would look nice. They did a great job.